€51.22
- Delivery time:
Currently out of stock, delivery time: 12-13 working days
- Item-No.: 114752
- Manufacturer-No.: 4,240,046
- Product-Weight: 0.2 kg
- Shipping info: Paket
Fronius DC Connector Kit for GEN24 4,240,046
Bridge MPP trackers for higher currents – designed for Fronius Primo and Symo GEN24
The Fronius DC Connector Kit GEN24 enables simple and safe bridging of MPP trackers on the Fronius Primo GEN24 and Fronius Symo GEN24 Plus. By combining the MPP trackers, the currents add up, allowing strings with higher current to be connected using cables up to 16 mm². This provides full flexibility in solar module selection. The touch-safe terminals eliminate the need for wire end ferrules.
Important note: Installation of this product must only be carried out by qualified personnel. Improper installation can cause damage to the product and the surrounding environment.
| Technical Data | |
| Product type: | DC connector kit / inverter accessory |
| Compatibility: | Fronius Primo GEN24, Fronius Symo GEN24 |
| Cable cross-section: | 4–16 mm² |
| Max. voltage: | 1,000 V |
| Max. current with Symo GEN24: | 56.26 A (Isc_pv) |
| Max. current with Primo GEN24 3.0–6.0: | 51 A (Isc_pv) |
| Dimensions (L/W/H): | 90 × 55 × 90 mm |
| Weight: | 0.13 kg |
For further technical details and notes, please refer to the datasheet.

10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
- Photovoltaic experts since 2008
- Only original products from top brands
- Short response times to inquiries
- 2% discount for prepayment
- Short delivery times
- Collection of in-stock items possible
Login
Manufacturer
Fronius International GmbH
Froniusstraße 1
4643 Pettenbach
Austria
E-Mail: contact@fronius.com
Web: www.fronius.com
Economic operator
Fronius Deutschland GmbH
Fronius Straße 1
36119 Neuhof-Dorfborn
Germany
Tel. / Fon:
+49 (0) 66 55-9 16 94-0
E-Mail: pv-sales-germany@fronius.com
Web: www.fronius.com/de
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.