€205.63
- Lieferzeit:
In stock, delivery time: 3-5 days (varies for international orders)
- Artikel-Nr.: 112855
- EAN: 9007947551788
- Hersteller-Nr.: 42,0411,0345
- Artikelgewicht: 0.35 kg
- Versandhinweis: Paket
Fronius SMART METER TS 65A-3 Bidirectional Power Meter 42,0411,0345
The Fronius Smart Meter TS 65A-3 is a compact three-phase energy meter for PV systems that measures both feed-in and grid import. With a current rating of up to 65 A per phase, it is ideal for small to medium-sized systems focused on self-consumption and feed-in control.
It reliably records all key parameters such as voltage, current, power and energy flows and can be directly combined with Fronius inverters. This allows efficient self-consumption optimization, load management and feed-in limitation.
Features:
- Bidirectional three-phase smart meter
- Rated current: up to 65 A per phase
- Measures both grid import and feed-in (import & export)
- Direct integration with Fronius inverters
- Ideal for self-consumption, monitoring and feed-in control
- Compact housing and easy installation
| Technical Data | |
| Manufacturer: | Fronius |
| Model: | Smart Meter TS 65A-3 |
| Phases: | 3-phase |
| Max. current per phase: | 65 A |
| Measurement type: | Bidirectional (import & export) |
| Measured values: | Voltage, current, power, energy flows |
| Application: | PV systems, self-consumption, feed-in control, energy monitoring |
| Installation: | Switchboard / distribution panel |

10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
- Photovoltaic experts since 2008
- Only original products from top brands
- Short response times to inquiries
- 2% discount for prepayment
- Short delivery times
- Collection of in-stock items possible
Manufacturer
Fronius International GmbH
Froniusstraße 1
4643 Pettenbach
Austria
E-Mail: contact@fronius.com
Web: www.fronius.com
Economic operator
Fronius Deutschland GmbH
Fronius Straße 1
36119 Neuhof-Dorfborn
Germany
Tel. / Fon:
+49 (0) 66 55-9 16 94-0
E-Mail: pv-sales-germany@fronius.com
Web: www.fronius.com/de
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.