€46.80
- Delivery time:
In stock, delivery time: 3-5 days (varies for international orders)
- Item-No.: 113337
- GTIN: 9007947554475
- Manufacturer-No.: 4,240,422
- Product-Weight: 0.26 kg
- Shipping info: Paket
Practical wall-mounted holder for safe and tidy storage of Type 2 charging cables
The Fronius Wattpilot Type 2 Cable Holder ensures neat, safe and convenient storage of Type 2 charging cables used with Fronius Wattpilot charging stations. It prevents cable bending, reduces tripping hazards and keeps the charging area organized and professional. The durable design makes it suitable for residential use as well as carports, garages and commercial charging points.
Features:
- Original Fronius holder for Type 2 charging cables
- Keeps cables stored securely and neatly
- Protects the charging cable from damage and wear
- Durable and robust wall-mount design
- Suitable for indoor and sheltered outdoor installation
- Easy installation on walls, garages or carports
| Technical Data | |
| Compatibility: | Fronius Wattpilot & Type 2 charging cables |
| Material: | Durable plastic / metal construction |
| Installation type: | Wall-mounted |
| Application: | Indoor and sheltered outdoor areas |

10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
- Photovoltaic experts since 2008
- Only original products from top brands
- Short response times to inquiries
- 2% discount for prepayment
- Short delivery times
- Collection of in-stock items possible
Manufacturer
Fronius International GmbH
Froniusstraße 1
4643 Pettenbach
Austria
E-Mail: contact@fronius.com
Web: www.fronius.com
Economic operator
Fronius Deutschland GmbH
Fronius Straße 1
36119 Neuhof-Dorfborn
Germany
Tel. / Fon:
+49 (0) 66 55-9 16 94-0
E-Mail: pv-sales-germany@fronius.com
Web: www.fronius.com/de
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.