Skip to main content Skip to search Skip to main navigation

GoodWe EV-Wallbox 22 kW GW22K-HCA G2

GoodWe EV-Wallbox 22 kW GW22K-HCA G2

The GoodWe HCA G2 EV wallbox allows drivers to maximize the use of solar energy by charging their electric vehicles (EVs) with a smart phase-switching function. Through seamless communication with the PV system's inverter and battery, the EV charger offers the flexibility to charge entirely with solar energy or, if needed, quickly top up from the grid, with multiple user-configurable charging modes, all managed via the GoodWe SEMS+ app. Furthermore, the HCA G2 EV charger provides drivers, employers, and leasing companies with transparency regarding charging energy costs for cost sharing and reimbursement by supporting multiple authentication methods. Please note that some smart charging modes, such as charging with excess PV power, are only available within the GoodWe network.

Features:

  • Various charging modes (depending on system configuration)
  • 6mA DC + 30mA AC residual current circuit breaker on board
  • Switchable between single- and three-phase operation for PV surplus charging
  • Includes 7.50 m long Type 2 charging cable and 2x RFID cards
  • Charging power up to 22 kW
  • Protection class: IP66 / IP55

Technical Data

Rated power / rated voltage / rated current: up to 22 kW / 400 V / 32 A
Connection phases: Single-phase and three-phase
Communication: Bluetooth, Wi-Fi, 2× RS485, LAN
Protection class: IP66 / IP55
Dimensions (height × width × depth): 208 × 450 × 170 mm

Please refer to the datasheet for further details.

 

Ask us any question
support agent
Phone: +49 561 / 220 706 0
Monday - Friday:
10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
Shop with confidence
  • Photovoltaic experts since 2008
  • Only original products from top brands
  • Short response times to inquiries
  • 2% discount for prepayment
  • Short delivery times
  • Collection of in-stock items possible
Confidence built in

Average rating of 4.9 out of 5 stars

4,9 of 5 Stars
Manufacturer "GoodWe"
GoodWe is a leading global manufacturer of PV inverters and energy storage solutions from China, which was even recognised as the world''s number 1 storage inverter in 2020 by Wood Mackenzie. In this regard, GoodWe offers a wide range of single-phase, three-phase solar and hybrid inverters for residential and commercial solar systems and ground-mounted systems. Well known are the inverters of the DNS, DT, SDT, MT and SBP series. GoodWe places particular emphasis on quality and has therefore received the "All Quality Matters" award six times in a row for good reason.

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.


benutzerhandbuch goodwe hca g2 v1 datasheet goodwe hca g2 v1 datenblatt goodwe hca g2 v1 goodwe limited warranty for ev charger eu quick installation guide goodwe hca g2 v1 user manual goodwe hca g2 v1

Safety Instructions:

1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.
2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.
Contact
us