- Delivery time:
- Order number: 113972
- Weight: 0.8 kg
- Manufacturer's no.: GMT3000-00-00P
- Collection possible: Self-Collection is currently not available.
Expected in July 2026
GoodWe GM3000 Smart Meter GMT3000-00-00P
The GoodWe GM3000 Smart Meter is a three-phase, high-precision energy meter designed for real-time measurement of grid import, export and load flows. It is used as part of GoodWe energy systems to enable accurate self-consumption control, dynamic power limitation and efficient energy management in PV installations.
With seamless communication to GoodWe inverters and the SEMS portal, the GM3000 provides all relevant measurement data for monitoring, analysis and load control. It is ideal for residential and commercial PV systems with a three-phase grid connection.
Features:
- Three-phase smart meter for GoodWe energy systems
- Measures import, export and load currents in real time
- High measurement accuracy for precise energy management
- Supports dynamic feed-in limitation
- RS485 communication with GoodWe inverters
- Compatible with the GoodWe SEMS portal
- Ideal for residential and commercial installations
- Compact DIN-rail mounting
| Technical Data | |
| Manufacturer: | GoodWe |
| Model: | GM3000 |
| Phases: | 3-phase |
| Communication: | RS485 |
| Measured values: | Import, export, loads, voltage, current, power |
| Installation: | DIN-rail |
| Compatibility: | GoodWe inverters & SEMS portal |
GoodWe Technologies Co., Ltd.
No. 90 Zijin Rd., New District,
Suzhou, 215011
China
service@goodwe.com
www.goodwe.com
GoodWe Europe GmbH
Kistlerhofstraße 170
81379 München
Deutschland
sales.de@goodwe.com
www.goodwe.com
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.