€10.50
% Was: €17.31 ¹ (39.34% saved)
- Delivery time:
Currently out of stock, delivery time: 102-103 working days
- Item-No.: 114424
- Manufacturer-No.: 02071129
- Product-Weight: 0.1 kg
- Shipping info: Paket
RFID Access Control Card for Efficient and Secure Charging
Huawei's RFID card offers an efficient solution for contactless data exchange, increasing security against unauthorized access and ensuring reliable identification. Assigning the card to the authorized user allows for secure and controlled unlocking of your wallbox, as the charging process only begins once the card is assigned. The RFID card is compatible with the Huawei Smart Charger.
Features:
- Contactless Data Exchange
- Reliable Identification
- Increased Security

10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
- Photovoltaic experts since 2008
- Only original products from top brands
- Short response times to inquiries
- 2% discount for prepayment
- Short delivery times
- Collection of in-stock items possible
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.