€34.76
- Lieferzeit:
Currently out of stock, delivery time: 105-107 days
- Artikel-Nr.: 114223
- EAN: 4251786217069
- Hersteller-Nr.: 2004783
- Artikelgewicht: 2.242 kg
- Versandhinweis: Paket
K2 Systems K2 GreenRoof Vento 10° Short Beam Set
Set for GreenRoof Vento 10° short support. Set consisting of GreenRoof Brace 332, GreenRoof Brace 480, GreenRoof Brace 831.5, GreenRoof Beam 1000, socket head bolt serrated M8x55, self-locking hexagon nut serrated M8.
| Technical Data | |
| Application Areas | Flat roof |
| Mounting Systems | K2 GreenRoof Vento |
| Component Type | Elevation system |
| Material | Aluminium EN AW 6060 T6, Aluminium EN AW 6063 T66, stainless steel A2-70 |

10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
- Photovoltaic experts since 2008
- Only original products from top brands
- Short response times to inquiries
- 2% discount for prepayment
- Short delivery times
- Collection of in-stock items possible
Safety Instructions:
1. Installation Instructions: Installation and operation of the product should only be carried out by persons who, due to their technical qualifications (e.g., education or professional experience), can ensure proper execution according to regulations.2. Suitability Check: Before installation, it must be verified whether the product meets the static requirements on-site. For roof installations, the structural load-bearing capacity of the roof must always be checked.
3. Compliance with Regulations: National and local building regulations, standards, and environmental protection regulations must be strictly observed.
4. Wearing Safety Clothing: Safety clothing must be worn (especially a safety helmet, work shoes, and gloves).
5. Roof Work Regulations: When working on roofs, the relevant regulations must be observed (e.g., use of fall protection systems, scaffolding with safety devices for eaves heights of 3 meters or more, etc.).
6. Presence of Multiple Persons: The presence of two persons is mandatory throughout the entire installation process to ensure quick assistance in the event of an accident.
7. Observe Installation Manual: The current version of the manufacturer's installation manual must be followed before installation. A copy of the manual must always be available at the construction site.
8. Module Manufacturer Installation Manuals: The installation instructions from module manufacturers must also be observed.
9. Equipotential Bonding: Equipotential bonding between individual system components must be carried out in accordance with the relevant national regulations.
10. Disassembly: Disassembly of the system must follow the installation steps in reverse order.
11. System Maintenance: The system must be professionally maintained, inspected, and serviced. An annual visual inspection is recommended.