- Delivery time:
- Order number: 114149
- Weight: 2.3 kg
- Manufacturer's no.: BU-SBSE-3P-50
- Collection possible: Baunatal
in stock (2-5 working days) (abroad may vary)
SMA Backup 3P Kit for Sunny Boy Smart Energy BU-SBSE-3P-50
The SMA Backup 3P Kit is the dedicated three-phase backup solution for the Sunny Boy Smart Energy hybrid inverter. It enables automatic switching to backup operation during a grid outage, ensuring that essential household loads continue to be supplied with power – reliably, safely and fully three-phase.
The kit includes all necessary components for protection, switching and operation of a dedicated backup circuit. Together with the Sunny Boy Smart Energy hybrid inverter, it forms a powerful emergency power system suitable for residential homes, small commercial installations or sensitive applications.
Features:
- Complete 3-phase backup kit for Sunny Boy Smart Energy
- Automatic grid disconnection & transfer to backup mode
- Three-phase supply of essential loads during outages
- High reliability thanks to SMA system certification
- Ideal for homes with heat pumps, servers or critical loads
- Easy integration into existing electrical installations
- Perfect addition to SMA hybrid and energy management systems
| Technical Data | |
| Manufacturer: | SMA Solar Technology |
| Model: | Backup 3P Kit (BU-SBSE-3P-50) |
| Phases: | 3-phase |
| Compatible devices: | Sunny Boy Smart Energy hybrid inverter |
| Function: | Emergency power supply / automatic switchover |
| Application: | Residential buildings, small commercial systems |
| Installation: | Distribution board / electrical cabinet |
SMA Solar Technology AG
Sonnenallee 1
34266 Niestetal
Deutschland
info@SMA.de
www.sma.de
SMA Solar Technology AG
Sonnenallee 1
34266 Niestetal
Deutschland
info@SMA.de
www.sma.de
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.