Skip to main content Skip to search Skip to main navigation

SMA Cluster Controller Top-Hat Rail Power Supply CLCON-PWRSUPPLY

SMA Cluster Controller DIN-rail Power Supply CLCON-PWRSUPPLY

The SMA CLCON-PWRSUPPLY is the dedicated DIN-rail power supply for the SMA Cluster Controller, ensuring a stable and reliable power supply inside control cabinets. It is designed for industrial environments and professional PV large-scale systems where the Cluster Controller operates as the central communication and monitoring component.

With its robust build quality, stable 24-V output and easy DIN-rail installation, the power supply guarantees uninterrupted operation of the SMA Cluster Controller in demanding applications.

Features:

  • DIN-rail power supply for SMA Cluster Controller
  • Stable 24-V DC output voltage
  • Industrial-grade reliability for continuous operation
  • Simple and fast DIN-rail mounting
  • Ideal for commercial and large-scale PV installations
  • Compact form factor for control cabinet integration

Technical Data
Manufacturer: SMA Solar Technology
Model: CLCON-PWRSUPPLY
Output voltage: 24 V DC
Application: Power supply for SMA Cluster Controller
Mounting: DIN-rail installation
Use cases: Commercial PV systems, large-scale installations
Ask us any question
support agent
Phone: +49 561 / 220 706 0
Monday - Friday:
10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
Shop with confidence
  • Photovoltaic experts since 2008
  • Only original products from top brands
  • Short response times to inquiries
  • 2% discount for prepayment
  • Short delivery times
  • Collection of in-stock items possible
Confidence built in

Average rating of 4.9 out of 5 stars

4,9 of 5 Stars
Manufacturer "SMA Solar Technology AG"
Founded in 1981 and headquartered in Kassel, SMA Solar Technology AG is one of the world's leading manufacturers of photovoltaic system technology. The company's portfolio includes a wide range of solar and hybrid inverters as well as integrated system solutions for photovoltaic systems of all power classes. In addition, intelligent energy management systems, battery storage systems for residential and commercial applications, and wallboxes for connecting to electromobility round off the product range. More than 4,000 employees in 20 countries are dedicated to creating the conditions for the decentralized and renewable energy supply of tomorrow. SMA's best-known product lines include the Sunny Boy, Sunny Tripower, and Sunny Island inverter series, which are recognized worldwide for their quality and performance. SMA manufactures its innovative solutions for all photovoltaic applications directly at its headquarters in Niestetal near Kassel, which provides the company with extreme flexibility, high efficiency, and low costs. This allows SMA to adapt optimally to individual market and customer requirements.
datasheet clcon 10 datenblatt clcon 10

Manufacturer

SMA Solar Technology AG
Sonnenallee 1
34266 Niestetal
Germany

Tel. / Fon: +49 (0) 561 95 22-0
E-Mail: info@SMA.de
Web: www.sma.de

Economic operator

SMA Solar Technology AG
Sonnenallee 1
34266 Niestetal
Germany

Tel. / Fon: +49 (0) 561 95 22-0
E-Mail: info@SMA.de
Web: www.sma.de

Safety Instructions:

1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.
2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.
Contact
us