
- Delivery time:
- Order number: 112260
- Weight: 0.98 kg
- EAN: 4262431422738
- Manufacturer's no.: 344-00000-52
- Collection possible: Baunatal
in stock (2-5 working days) (abroad may vary)
Tigo Energy Cloud Connect Advanced Set Indoor
The Cloud Connect Advanced communication unit connects the TS4-R components with the SMA Sunny Portal monitoring solution via WLAN or Ethernet. This means that operators can keep an eye on their systems via remote monitoring and can respond quickly in the event of irregularities. Cloud Connect Advanced can communicate with up to six gateways. Via Cloud Connect Advanced, the TS4-R and gateway components of the PV system can be configured easily using a smartphone app.
Set includes:
- Gateway
- Cloud Connect Advanced
- Din rail power supply & mounting hardware
Tigo Energy, Inc.
655 Campbell Technology Parkway Suite 150
Campbell, CA 95008
Vereinigte Staaten
https://tigoenergy.com/
Economic actor:Tigo Energy EMEA Büro
Tigo Energy Italien Srl Via Calamandrei 36
52025 Montevarchi Toskana
Italien
https://de.tigoenergy.com/contacts
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.