€12.52
% Was: €17.31 ¹ (27.67% saved)
- Delivery time:
In stock, delivery time: 3-5 days (varies for international orders)
- Item-No.: 113395
- GTIN: 4262431422691
- Manufacturer-No.: SE-ACCRF10-01
- Product-Weight: 0.01 kg
- Shipping info: Paket
SolarEdge RFID Card for Wallbox SE-ACCRF10-01
Charging authentication via RFID for SolarEdge wallboxes
The SolarEdge RFID card enables simple and secure charging authentication at the SolarEdge wallboxes. It is compatible with the SolarEdge Home EV Charger, the SolarEdge ONE Charging Station and the SolarEdge ONE Charging Station Pro.
| Technical Data | |
| Product type: | RFID card / wallbox accessory |
| Compatibility: | SolarEdge Home EV Charger, SolarEdge ONE Charging Station, SolarEdge ONE Charging Station Pro |
For further technical details and notes, please refer to the datasheet.

10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
- Photovoltaic experts since 2008
- Only original products from top brands
- Short response times to inquiries
- 2% discount for prepayment
- Short delivery times
- Collection of in-stock items possible
Login
Manufacturer
SolarEdge Technologies Ltd.
1st Hamada Street,
Herzliya, 4673335,
Israel
Tel. / Fon: +972 9957 6620
Web: www.solaredge.com
Economic operator
SolarEdge Technologies GmbH
Werner-Eckert-Str.6
81829 München
Germany
Tel. / Fon: +49 (0) 89-454597-0
E-Mail: support@solaredge.de
Web: www.solaredge.com/de
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.