€0.38
- Lieferzeit:
In stock, delivery time: 3-5 days (varies for international orders)
- Artikel-Nr.: 112059
- EAN: 4251786201273
- Hersteller-Nr.: 1002361
- Artikelgewicht: 0.011 kg
- Versandhinweis: Paket
K2 Systems K2 Distance pad, 1002361
The K2 spacer pad is ideally suited for height compensation when installing threaded roof hooks and the K2 SingleRail. These spacer pads are placed between the roof hooks and the climbers, allowing for individual height adjustment. Up to two spacer pads can be stacked. Each pad has a material thickness of 2 mm and is made of durable polyamide.
| Technical Data | |
| Application Areas | Pitched Roof |
| Roof Fastener | Roof Hook |
| Mounting Systems | K2 SingleRail System |
| Component Type | Accessory |
| Material | PA6.6-GF35 / PA6.6-GF50 |
Please refer to the data sheet for further details.

10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
- Photovoltaic experts since 2008
- Only original products from top brands
- Short response times to inquiries
- 2% discount for prepayment
- Short delivery times
- Collection of in-stock items possible
Safety Instructions:
1. Installation Instructions: Installation and operation of the product should only be carried out by persons who, due to their technical qualifications (e.g., education or professional experience), can ensure proper execution according to regulations.2. Suitability Check: Before installation, it must be verified whether the product meets the static requirements on-site. For roof installations, the structural load-bearing capacity of the roof must always be checked.
3. Compliance with Regulations: National and local building regulations, standards, and environmental protection regulations must be strictly observed.
4. Wearing Safety Clothing: Safety clothing must be worn (especially a safety helmet, work shoes, and gloves).
5. Roof Work Regulations: When working on roofs, the relevant regulations must be observed (e.g., use of fall protection systems, scaffolding with safety devices for eaves heights of 3 meters or more, etc.).
6. Presence of Multiple Persons: The presence of two persons is mandatory throughout the entire installation process to ensure quick assistance in the event of an accident.
7. Observe Installation Manual: The current version of the manufacturer's installation manual must be followed before installation. A copy of the manual must always be available at the construction site.
8. Module Manufacturer Installation Manuals: The installation instructions from module manufacturers must also be observed.
9. Equipotential Bonding: Equipotential bonding between individual system components must be carried out in accordance with the relevant national regulations.
10. Disassembly: Disassembly of the system must follow the installation steps in reverse order.
11. System Maintenance: The system must be professionally maintained, inspected, and serviced. An annual visual inspection is recommended.