€21.98
- Lieferzeit:
In stock, delivery time: 3-5 days (varies for international orders)
- Artikel-Nr.: 113526
- EAN: 4262355111664
- Hersteller-Nr.: 81140-2400
- Artikelgewicht: 1.99 kg
- Versandhinweis: Paket
SL Rack Module Mounting Profile RAIL 40; 2400 mm, 81140-2400
Module support element for all SL Rack roof connections. Dimensions: 2400 x 40 x 40 mm.
| Technical data | |
| Application: | Pitched roof, flat roof |
| Manufacturer number: | 81140-2400 |
| Weight: | 1.99 kg |
| Material: | Aluminium |
Please see the data sheet for further details.

10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
- Photovoltaic experts since 2008
- Only original products from top brands
- Short response times to inquiries
- 2% discount for prepayment
- Short delivery times
- Collection of in-stock items possible
Manufacturer
SL Rack GmbH
Münchener Straße 1
83527 Haag i. OB
Deutschland
info@sl-rack.com
www.sl-rack.com
Economic operator
SL Rack GmbH
Münchener Straße 1
83527 Haag i. OB
Deutschland
info@sl-rack.com
www.sl-rack.com
Safety Instructions:
1. Installation Instructions: Installation and operation of the product should only be carried out by persons who, due to their technical qualifications (e.g., education or professional experience), can ensure proper execution according to regulations.2. Suitability Check: Before installation, it must be verified whether the product meets the static requirements on-site. For roof installations, the structural load-bearing capacity of the roof must always be checked.
3. Compliance with Regulations: National and local building regulations, standards, and environmental protection regulations must be strictly observed.
4. Wearing Safety Clothing: Safety clothing must be worn (especially a safety helmet, work shoes, and gloves).
5. Roof Work Regulations: When working on roofs, the relevant regulations must be observed (e.g., use of fall protection systems, scaffolding with safety devices for eaves heights of 3 meters or more, etc.).
6. Presence of Multiple Persons: The presence of two persons is mandatory throughout the entire installation process to ensure quick assistance in the event of an accident.
7. Observe Installation Manual: The current version of the manufacturer's installation manual must be followed before installation. A copy of the manual must always be available at the construction site.
8. Module Manufacturer Installation Manuals: The installation instructions from module manufacturers must also be observed.
9. Equipotential Bonding: Equipotential bonding between individual system components must be carried out in accordance with the relevant national regulations.
10. Disassembly: Disassembly of the system must follow the installation steps in reverse order.
11. System Maintenance: The system must be professionally maintained, inspected, and serviced. An annual visual inspection is recommended.