- Delivery time:
- Order number: 112742
- Weight: 0.1 kg
- Manufacturer's no.: 256330
- Collection possible: Baunatal
in stock (2-5 working days) (abroad may vary)
Solare Datensysteme Solar-Log MOD I/O 256330
Mod I / O Modules for Power Management strong> p> The I / O module is the ideal complement to the Solar-Log Base and extends its capabilities. Equipped with a large number of digital IN and OUTPUTS, with the I / O module you are ideally equipped to meet the requirements for the implementation of the feed-in management. The I / O module is simply docked to the Solar-Log Base via Plug and Play. The advantages of the MOD I / O module in combination with the Solar-Log Base:
Solar-Log GmbH
Fuhrmannstraße 9
72351 Geislingen-Binsdorf
Deutschland
info@solar-log.com
www.solar-log.com
Solar-Log GmbH
Fuhrmannstraße 9
72351 Geislingen-Binsdorf
Deutschland
info@solar-log.com
www.solar-log.com
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.