€156.18
% Was: €278.46 ¹ (43.91% saved)
- Delivery time:
In stock, delivery time: 3-5 days (varies for international orders)
- Item-No.: 112843
- GTIN: 4262431421823
- Manufacturer-No.: SE-MTR-3Y-400V-A 100A
- Product-Weight: 0.525 kg
- Shipping info: Paket
SolarEdge Energy Meter SE-MTR-3Y-400V-A with 3x 100 A Current Transformers
The SolarEdge energy meter SE-MTR-3Y-400V-A with three 100 A current transformers enables accurate monitoring of energy flows in PV systems and storage installations. It delivers reliable real-time data for consumption, generation and grid export — fully compatible with SolarEdge inverters.
Features:
- High-accuracy measurement of production, consumption and export/import
- Supports single-phase and three-phase networks (230/400 V)
- Modbus/RS485 interface for seamless integration into energy management systems
- Import/Export metering for feed-in limitation and self-consumption optimization
- Compact design — fits standard electrical panels, easy DIN-rail or wall mounting
- Suitable for residential, commercial and utility-scale installations
| Technical Data | |
| Manufacturer: | SolarEdge |
| Model: | SE-MTR-3Y-400V-A |
| Current Transformers: | 3 × 100 A |
| Voltage / Grid: | 230 / 400 V, single-/three-phase |
| Interface: | Modbus / RS485 |
| Mounting: | DIN-rail or wall |
| Application: | Production, consumption, export/import, self-consumption optimization |

10 a.m. - 12 p.m. and
2 p.m. - 4 p.m.
- Photovoltaic experts since 2008
- Only original products from top brands
- Short response times to inquiries
- 2% discount for prepayment
- Short delivery times
- Collection of in-stock items possible
Manufacturer
SolarEdge Technologies Ltd.
1st Hamada Street,
Herzliya, 4673335,
Israel
Tel. / Fon: +972 9957 6620
Web: www.solaredge.com
Economic operator
SolarEdge Technologies GmbH
Werner-Eckert-Str.6
81829 München
Germany
Tel. / Fon: +49 (0) 89-454597-0
E-Mail: support@solaredge.de
Web: www.solaredge.com/de
Safety Instructions:
1. Installation by Qualified Personnel: The installation of smart meters must only be carried out by qualified electricians or authorized professionals.2. Power Circuit Disconnection: Before installation, the power circuit into which the smart meter will be integrated must be completely disconnected and checked for powerlessness.
3. Ensure Proper Grounding: Verify the proper grounding of the system before connecting the smart meter.
4. Select Installation Location: Install the device only in a safe, well-ventilated, and dry indoor area that meets the manufacturer's installation requirements.
5. Correct Cable Connection: Use only manufacturer-recommended cables and connections, ensuring correct polarity and secure contacts.
6. Danger from High Voltages: Smart meters are integrated into power circuits that may be live. Avoid any contact with open connections or wires.
7. Use Proper Circuit Protection: Connect the smart meter only to power circuits with appropriate protective switches (e.g., residual current devices (RCDs) or circuit breakers).
8. Check Insulation: Inspect cable insulation and connection status before commissioning to avoid short circuits.
9. No Modifications: Do not alter or modify the smart meter or its wiring.
10. Avoid Overloading: Do not exceed the manufacturer's specified maximum current load for the smart meter.
11. No Unauthorized Modifications: Unauthorized alterations, modifications, repairs, or opening of the product are strictly prohibited.